Still moving along. We can’t wait to get into the new digs. Still a month or two more. Inside is moving along with trim installation and finalizing tile work. This day was also big outside with lots of final grading work happening. These pics were taken 10-26-2009.
Trim work is moving along inside. You can see the door trim and baseboards in this pic. Once they are all painted, the look will be much cleaner.
And now for the travertine tile we used in the laundry room (shown here) and the nearby mudroom. Should be durable and up to the challenges of wet shoes and clothes: